20 Martin Place, Sydney
The ASP Access Floor system installed in 20 Martin Place offers the tenants long-term economic, functional and sustainable benefits.
Client
Pembroke Property
Builder
Built Holdings
Purpose & Size
Base Build Office Fit Out: 15,800m²
Duration
6 Months
Completed
October 2014
Key Features and Benefits
20 Martin Place applies contemporary thinking and environmentally sustainable design to deliver tangible long-term economic and tenant benefits. As such it has been awarded a 6 Star Green Star – Office As Built v3 certified rating, from the Green Building Council of Australia.
Over 15,000m2 of access flooring was installed throughout the buildings 21 floors of office and retail space.
Access Floor System Used
Steel Cementitious Ultra fix stringerless system with a 3.0kN loading at 150mm FFH
Product Code: SC-3.0-UF