Skip to content
Melton Library and Learning Hub, Melbourne

Melton Library and Learning Hub, Melbourne

The Melton Library and Learning Hub is Australia’s first library awarded with a 5 Star Green Star rating and has been designed with sustainability in mind; utilizing efficient building operating systems such as air conditioning, lighting and water harvesting. ASP Access Floors rose to the challenge, delivering an air controlled access floor plenum capable of meeting the ecological and economical requirements, and underlining our commitment to environmentally-friendly development.

Client

Melton Council

Builder

ADCO Constructions

Purpose & Size

Commercial 2,800m²

Duration

12 Months

Completed

December 2012

Access Floor System Used:

Steel Cementitious Ultra Fix Air Tight System with a 6.0 kN loading at 600mm FFH

Product Code: SC-64-6.0-UF-AT

Steel Cementitious Ultra Fix Air Tight System with a 9.0 kN loading at 600mm FFH

Product Code: SC-64-9.0-UF-AT

Steel Cementitious HPL Rigid Grid System with a 4.5 kN loading at 600mm FFH

Product Code: SC-64-4.5-RG-HPL

Project Features and Highlights:

To meet the sustainability requirements for this project, ASP Access Floors employed the use of our heavy, extra heavy and industrial grade air controlled access floor plenum and rigid grid systems to achieve the necessary environmental outcomes.

Melton Library and Learning Hub, Melbourne

Melton Library and Learning Hub, Melbourne

The Melton Library and Learning Hub is Australia’s first library awarded with a 5 Star Green Star rating and has been designed with sustainability in mind; utilizing efficient building operating systems such as air conditioning, lighting and water harvesting. ASP Access Floors rose to the challenge, delivering an air controlled access floor plenum capable of meeting the ecological and economical requirements, and underlining our commitment to environmentally-friendly development.

Client

Melton Council

Builder

ADCO Constructions

Purpose & Size

Commercial 2,800m²

Duration

12 Months

Completed

December 2012

Access Floor System Used:

Steel Cementitious Ultra Fix Air Tight System with a 6.0 kN loading at 600mm FFH

Product Code: SC-64-6.0-UF-AT

Steel Cementitious Ultra Fix Air Tight System with a 9.0 kN loading at 600mm FFH

Product Code: SC-64-9.0-UF-AT

Steel Cementitious HPL Rigid Grid System with a 4.5 kN loading at 600mm FFH

Product Code: SC-64-4.5-RG-HPL

Project Features and Highlights:

To meet the sustainability requirements for this project, ASP Access Floors employed the use of our heavy, extra heavy and industrial grade air controlled access floor plenum and rigid grid systems to achieve the necessary environmental outcomes.

Melton Library and Learning Hub, Melbourne

Melton Library and Learning Hub, Melbourne

The Melton Library and Learning Hub is Australia’s first library awarded with a 5 Star Green Star rating and has been designed with sustainability in mind; utilizing efficient building operating systems such as air conditioning, lighting and water harvesting. ASP Access Floors rose to the challenge, delivering an air controlled access floor plenum capable of meeting the ecological and economical requirements, and underlining our commitment to environmentally-friendly development.

Client

Melton Council

Builder

ADCO Constructions

Purpose & Size

Commercial 2,800m²

Duration

12 Months

Completed

December 2012

Access Floor System Used:

Steel Cementitious Ultra Fix Air Tight System with a 6.0 kN loading at 600mm FFH

Product Code: SC-64-6.0-UF-AT

Steel Cementitious Ultra Fix Air Tight System with a 9.0 kN loading at 600mm FFH

Product Code: SC-64-9.0-UF-AT

Steel Cementitious HPL Rigid Grid System with a 4.5 kN loading at 600mm FFH

Product Code: SC-64-4.5-RG-HPL

Project Features and Highlights:

To meet the sustainability requirements for this project, ASP Access Floors employed the use of our heavy, extra heavy and industrial grade air controlled access floor plenum and rigid grid systems to achieve the necessary environmental outcomes.

Back To Top