University of Adelaide
The 8 floor 6 Star Adelaide University project required an Air Tight access floor system. Due to the University’s learning environment, the acoustic properties of the access flooring was a high priority in order to decrease sound transmission through the floor between classrooms.
Client
University of Adelaide
Builder
Hindmarsh Constructions
Purpose & Size
University: 10,000m²
Duration
12 Months
Completed
January 2010
Access Floor System Used:
Project Features and Highlights:
This project introduced a new concept combining ASP Access Floor’s Air Tight System with an acoustic form baffling system. The product “Soberfoam” was utilized and the 25mm foam panels were fixed with an adhesive to the underside of the access floor panels.
The foam panels were also incorporated with ASP’s proprietary air highway system to provide insulated acoustic baffles between zones.