Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the polylang domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/aspfl00rscp/public_html/staging.aspfloors.com/wp-includes/functions.php on line 6131
Canterbury RSL Club Upgrade - ASP Access Floors Skip to content
Canterbury RSL Club Upgrade

Canterbury RSL Club Upgrade

Refurbishment and upgrade to existing RSL Club, completion over eight stages to improve flexibility for the club’s gaming requirements.

Refurbishment of existing RSL Club with the introduction of underfloor air-conditioning to associated areas – 2,100 m2

Builder

MPA Projects Pty Ltd

Purpose & Size

Refurbishment of existing RSL Club with the introduction of underfloor air-conditioning to associated areas – 2,100 m2

Duration

Approx 2 years

Completed

2018

Access Floor System Used:

Installation of New Steel Cementitious Ultrafix stringerless system with a 9.0kN loading at a combined 120 and 500mm FFH, with S1/S2 and S5/S6 pedestals.

Product Code: SC-9.0-UF

Project Features and Highlights:

The club refurbishment will allow for open planned flexibility for relocation of gaming equipment. There will be a combination of different floor requirements introduced for the installation of under floor air-conditioning to associated areas, in order to meet the current Green Star and Club requirements.

The floor being a 9.0kN panel will provide added strength for equipment to be moved freely without the requirement for added protection.

Back To Top