Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the polylang domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/aspfl00rscp/public_html/staging.aspfloors.com/wp-includes/functions.php on line 6131
Rimt Swanston Academic Building - ASP Access Floors Skip to content
Rimt Swanston Academic Building

RMIT Swanston Academic Building

Server room fit out in the SAB at RMIT.

The Who’s Who

Client

RIMT University

Builder

Brookfield Multiplex

Purpose & Size

University: 22m²

Duration

1 Week

Completed

March 2012

Access Floor System Used:

Steel Cementitious HPL Rigid Grid System with a 4.5kN loading at 845mm FFH.
Product Code:
SC-64-4.5-RG-HPL