Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the polylang domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/aspfl00rscp/public_html/staging.aspfloors.com/wp-includes/functions.php on line 6131
20 Martin Place, Sydney - Skip to content
20 Martin Place, Sydney

20 Martin Place, Sydney

The ASP Access Floor system installed in 20 Martin Place offers the tenants long-term economic, functional and sustainable benefits.

Client

Pembroke Property

Builder

Built Holdings

Purpose & Size

Base Build Office Fit Out: 15,800m²

Duration

6 Months

Completed

October 2014

Key Features and Benefits

20 Martin Place applies contemporary thinking and environmentally sustainable design to deliver tangible long-term economic and tenant benefits. As such it has been awarded a 6 Star Green Star – Office As Built v3 certified rating, from the Green Building Council of Australia.

Over 15,000m2 of access flooring was installed throughout the buildings 21 floors of office and retail space.

Access Floor System Used

Steel Cementitious Ultra fix stringerless system with a 3.0kN loading at 150mm FFH

Product Code: SC-3.0-UF

Back To Top