Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the polylang domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/aspfl00rscp/public_html/staging.aspfloors.com/wp-includes/functions.php on line 6131
Zurich Tower, North Sydney - Skip to content
Zurich Tower, North Sydney

Project Exclusive

North Sydney’s Zurich Tower, the 29 storey A-grade commercial office tower. Situated in a prominent position on the edge of North Sydney’s CBD. It’s the Australian headquarters for one of Australia’s most recognised insurers, Zurich Finical Services.

The Tower features a flexible, modern open plan workspace design. It was engineered to best capture the city skyline and harbour views, providing a bright and ergonomical environment for its occupants. Zurich Tower is a spot of luxury, in its finishes, amenities and design. It also houses a large sky terrace to soak in the city views.

Zurich Tower was awarded a Five-Star Green Star Design and As-Built Certification V1.1 ratings from the Green Building Council of Australia, plus a 5-Star NABERS Energy rating.

Client

University of Technology

Client

University of Technology

Client

University of Technology

Client

University of Technology

University of Adelaide
University of Adelaide

The Access Floor Scoop

ASP Access Floors installed 223,000ft / 20,700m2 of Access Flooring throughout the Zurich Tower. ASP installed our Icon X system, 3.0kN and 4.5kN panels.

Icon X features numerous sustainability credentials including an LCA, EPD and 97% recycled content. ASP’s sustainability initiatives helped CBRE to successfully facilitate a successful 5 Star Green Star build.

ASP Access Floors continue to return to Zurich Tower to assist with new fit outs. Our Access Flooring system allows flexibility, and ease of reconfiguration with reduced costs to our clients.

 

Back To Top