Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the polylang domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/aspfl00rscp/public_html/staging.aspfloors.com/wp-includes/functions.php on line 6131
Australian Catholic University - Skip to content
Australian Catholic University

Australian Catholic University

As the Australian Catholic University harvests rainwater from its’ roof and is fitted out with water saving appliances; low energy lights and an extremely energy efficient heating and cooling system, along with other sustainable features were imperative for this project.

The Who’s Who

Client

Australian Catholic University

Builder

Abigroup

Purpose & Size

University: 20,000m²

Duration

6 Months

Completed

February 2012

Access Floor System Scoop

AF01 – Steel Cementitious Air Tight stringerless system with a 4.5Kn loading at 450mm FFH

Product Code: SC-64-4.5-AT

Steel Cementitious HPL Rigid Grid System with a 4.5kN loading at 150mm FFH in switch rooms

Product Code: SC-64-4.5-RG-HPL

Project Features and Highlights:

As the Australian Catholic University has been awarded the maximum 6 Star Green Star – Education Design v1 Certified rating from the Green Building Council of Australia, ASP had to comply with the sustainable nature of the project. ASP aimed to use sustainable features in their floors which predominantly had a vinyl finish on top, along with the under floor air-conditioning.

Back To Top