Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the polylang domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/aspfl00rscp/public_html/staging.aspfloors.com/wp-includes/functions.php on line 6131
Australian International School, Singapore - Skip to content
Australian International School, Singapore

Australian International School, Singapore

The project was intended to be environmentally friendly and, thus, sustainable to coincide with the school’s intentions of an ‘eco friendly working environment’ ensuring AIS students are in the best environment to exceed the school’s expectations, and their own. ASP’s ultra fix system fits the scope required as it’s made from 97% recycled content and is easily adjusted and maintained.

Access Floor System Used:

Steel Cementitious Ultra fix system with a 3.0kN loading and 150mm FFH

Product Code: SC-3.0-UF

Project Features and Highlights:

The campus is a bright, airy and semi-modern building with large pod spaces for group work. In 2011, a new Senior building was opened to accommodate Year 10, 11 and 12 students. This wing incorporates private study spaces, nearly 40 classrooms and a new Science, Art, Music and Technology area.

Back To Top